Low Farm 132kV Outdoor Compound

Dates: May 2023 – August 2024

Location: Low Farm, Lincolnshire


Switch Power Distribution installed the structures and earthing on a National Grid 132kV compound at Low Farm Solar Park. Including installation of the bus bars, VTs, circuit breaker, 3No. Disconnectors and Earth Switches and 1No. OHL Structure.